Pocono Lake Addition

 

Rob in joists

There’s Rob assembling the pressure-treated floor framing

 

walls up

Walls are up!

 

one side sheathed

Tying-in the new roof and sheathing it…

 

 

 

 

 

Re-shingle all…

 

 

 

 

 

 

Got to wrap it!  What are those white panels spread around? Those are the backs of the T-111 panels being primer-sealed to keep the moisture and bugs out.

 

 

 

 

 

 

Heavily insulated with R-30

 

foundation access Two access openings for the crawlspace. Note the outside electrical outlet for plugging in a weed-wacker for yard maintenance etc.